Yixing Guoxin Xielian Ultra-Long-Distance Central Heating Official Website Project
Construction Scale: Main pipeline DN600, total length 115 km (three lines), with the longest single line being 42 km.
Centralized Heating Technology
Harbin Heating Transformation Project
The Harbin Yinquan Life Incineration Power Generation Project is designed to process 2,250 tons of domestic waste per day, with the plant equipped with 3×750 t/d grate incinerators and 2 sets of 25 MW steam turbine generators.
Heating is provided through a combination of heat pumps and steam-water heat exchangers, covering an area of 280,000 m² with a supply and return water temperature of 95°C/50°C. The scope of design is for the internal renovation of the power plant and for Everbright Design Institute's EPC projects.